It is possible to force transports containing specific critical SAP objects (standard or custom) to stop for an additional approval in the workflow.

This feature sits on top of the existing Risk Guard and Skipping functionalities.

Configuration Steps

1) Add the following four entries to /BTI/TE_EXITC table in the Domain Controller

/BTI/TE_EXIT_SAMPLE_0710
/BTI/TE_EXIT_SAMPLE_0740
/BTI/TE_EXIT_SAMPLE_0500
/BTI/TE_EXIT_SAMPLE_0505

2) Create Risk Groups in table /BTI/TE_RISKG for each grouping of approvals that you want.

For example

BT9001 – Security Objects
BT9002 – Basis Objects
BT9003 – Finance Objects

2) Create a new Risk Level for these objects in /BTI/TE_RISKL.

3) Add entries in table /BTI/TE_RISKGOB for each object you want to stop for additional approval. Use RISK LEVEL defined in Step (2)

4) Add a new Control Point (ie Inbox or Outbox) where you want the additional approval to occur if the transport contains the objects defined in (4).

5) Add entries in table /BTI/TE_RISKUSER for who you want to be able to approve each Risk Group.

6) Add the Approvers in the ActiveControl Windows GUI configuration against the required target/control point.

7) Create new Skipping Rules.
(i) Add Skipping Rules in table /BTI/TE_SKIPCP in the Domain Controller for all Transport Form ‘Types’ to skip new Control Point.
(ii) Add Skipping Rules in table /BTI/TE_SKIPCP in the Domain Controller for all Transport Form ‘Types’ to NOT SKIP when they contain the Risk Groups created above – by adding in RISK_LEVEL that you defined in Step

Feedback

Was this helpful?

Yes No
You indicated this topic was not helpful to you ...
Could you please leave a comment telling us why? Thank you!
Thanks for your feedback.

Post your comment on this topic.

Post Comment