ActiveControl includes Merge functionality for helping to keep multi-track SAP landscapes consistent.
The configuration detailed in this section can be ignored if you are operating a single-track SAP landscape.
# | Activity | _. Details |
---|---|---|
3.5.1 | Setup Merge | Please refer to the ActiveControl Administration Guide and/or online FAQ Forum for detailed instructions on setting up Merge Process. |
3.5.2 | Switch on Merge Conflict Analysis | Within the Targets and Transport Paths tab, open all Merge Target Systems and in the Analysis Types tab, switch on ‘Conflict Analysis’ and make it mandatory. |
3.5.3 | Configure In-Line Conflict Analysis Systems | Use SM31 to update table /BTI/TE_INLINE in the Domain Controller to configure which systems should be checked for parallel development activity. For example, if systems ECD and EPD are parallel development systems, “Active” entries should be created here for ECD -> EPD and EPD -> ECD. |
3.5.4 | Configure In-Line Conflict Analysis Systems | In the Windows GUI, ensure that you have entered a client number in the “Before Importing, check whether….” text box for the target. This is required so that ActiveControl knows which client to connect to for the analysis. |
Post your comment on this topic.