Cutover activities
5. Go-Live & Support » Cutover activities
The following activities should be performed just prior to your ActiveControl Go-Live: # Activity Details 5.1 Assign Schedules Within the Targets and Transport Paths tab, open each Target System and allocate the relevant…
Cutover activities
Cutover activities
The following activities should be performed just prior to your ActiveControl Go-Live: # Activity Details 5.1 Assign Schedules Within the Targets and Transport Paths tab, open each Target System and allocate the relevant TE…
4. Final Preparation
4. Final Preparation
This section details the final preparatory activities that should be done prior to Go-Live.
Useful ActiveControl Templates
Introduction » Useful ActiveControl Templates
ActiveControl Document Purpose Implementation Plan Outlines the main activities required during a standard ActiveControl implementation. Data Migration Template used to migrate inflight ticket & transport into…
Configuration
3. Realization » Configuration
After completing the preparation and installation activities outlined in the previous sections, ActiveControl can then be configured. This section has been split into two main sub-sections to reflect the configuration that needs to be done within the ActiveControl…
Mandatory Configuration (Windows GUI)
3. Realization » Configuration » Mandatory Configuration (Windows GUI)
The following configuration should be done within the ActiveControl Windows GUI main Configuration screen (accessible via Tools >> Configuration…). # Activity Details 3.2.1 Upgrades Only If performing Upgrade from…
1. Preparation
1. Preparation
Some preparatory activities need to be undertaken within your organisation before ActiveControl can be installed and configured, to define the scope of your ActiveControl rollout and map out the required processes and approvals workflow to be used. Basis Technologies…
Optional Configuration
3. Realization » Configuration » Optional Configuration
The following configuration and set-up is deemed optional and is not mandatory for running ActiveControl. Many organisations choose not to setup some or all of these steps due to their own internal and external requirements and obligations. # Activity …