The default sequencing within ActiveControl is based on the release date/time of the transports.

For example, if transport A is released at 15:00 on 1st January 2023, and transport B is released at 16:00 on 1st January 2023, and both transports are sitting in an Import Queue, then ActiveControl would ‘order’ Transport A to be imported before transport B.

It is possible to change this default sequencing within ActiveControl in several ways: